Dr. Mazen Abbas

Dr. Mazen Abbas

Lecturer
Erfahrungen

PAP hotels Corporation, Greece

1994 to date: Technical Manager

Nikolaos Dim Sakellaridis, Greece

1993 to 1994 Chief Architectural Engineer

Dr. Georgios TH. Koutoupis, Greece

1992 to 1993 Chief Architectural Engineer.

Worked Independently on building projects

1990-1992 Architectural Engineer.

 

1994 to date PAP Hotels Corporation, Greece

  • Worked on many architectural projects for the company as a technical manger. Duties include the coordinator with clients on technical issues and details. The following is a list of important projects.
    • 1995-2000 Preliminary – executive – final study about 8.570.000 U.S. Expanding Xenia Ouranoupolis Hotel form 40 to 150 rooms with all accessories and services. The idea of the hotel is the respect of the historical & natural cause locate it by “Holy Asoos Mountain” contains special wings with five star restaurants.
    • Complex for Nine houses with two level duplex in “Thessaloniki” city Oraiokastro district.
    • Final study and starting executive in 2000 with budget 857.000 Mixed between modern & traditional civilization. Plotting monument at 3 paraskevopoulou. St. Institute Hotel studies.

 

  • Nikolaos Dim Sakellaridis, Greece

1993 to 1994 Chief Architectural Engineer.

Chief architectural Engineer – responsible for designing architectural issue official govermment license.

2-1- an office storehouses liquid fuels stations building for “GREEK OILS” company S.A. Budget 860.000 USD, in lonia, Thessaloniki.

2-2- Office Building for the petroleum products trade company (A.E.E.P) G. MAMIDAKIS and Co. 570.000 USD.

23- A complex of country houses, Dimitrios Hatzinasion budgets 1.150.000 USD in polyhrono St. Thessaloniki.

 

  • Georgios TH. Koutoupis, Greece

1992 to 1993 Chief Architecutral engineer.

3-1- Final study “Building of the Department of paedagogics aristole University of Thessaloniki” (Phases A), within the framework of the research project “regulating design of the Aristotle University of Thessaloniki Main campus” (Campus B) through the research committee of the Aristotle University of Thessaloniki. Scientific co-ordinator: Profs. K. Demiris, G. Kontaxakis A. Kotsiopoulos 1992 budget (rate 2000) 1.429.000 USD.

3-2- Final study for A ”Gymnasium of 2000 seats in komotini” 1st prize at a contest for the study construction system 1992. Budget 2.143.000 USD.

3-3- Final study “Building of the Department of Electrical Engineering, Democritus University of Thrace (phase A) within the framework of the research project “investigation of planning Regulating design, and building of the Dempcritus Unviersity of Thrace through the research committee of the Democritus University of Thrace in cooperation with the Aristotle University of Thessaloniki. Scientific co-ordinator Prof. A. Liolios, 1992, budget 1.429.000 USD.

3-4- “A preliminary study for the Department of visual and Applied Arts, Music studies, drama studies and for the Deanery of the school of fine Arts, Aristotle University of Thessaloniki” within the framework of the research project “Regulating design and preliminary study for the School of fine Arts, Aristotle University of Thessaloniki through the research committee of the Aristotle university of Thessaloniki. Scientific co-ordinators: Profs. G. Kontaxakis, E. Tzakakis, P. panagiotopoulos, 1993. Budget 5.572.000 USD.

Specialize in formed building “MAKET


Bildung
• Ph. D. in Architectural Engineering 1998 Aristotle University of Thessaloniki (Greece). • Diploma in Architectural Engineering. Aristotle University of Thessaloniki.